Document Control Procedure

Document Type: Procedure
Version: 1.0
Last Updated: February 2026
Distribute To: Project Managers, Project Engineers, Admin


Purpose

Establish procedures for managing project documents to ensure the right information is available to the right people at the right time.


Document Control Principles

  1. One Version of Truth - Single source for current documents
  2. Controlled Distribution - Track who has what
  3. Revision Management - Clear superseded documents
  4. Easy Access - Findable and retrievable
  5. Secure Storage - Protected and backed up

Document Categories

CategoryExamplesRetention
ContractContract, exhibits, amendmentsPermanent
DesignDrawings, specificationsPermanent
SubmittalsShop drawings, dataProject + 6 years
CorrespondenceLetters, emailsProject + 6 years
AdministrativeRFIs, meeting minutesProject + 6 years
FinancialPay apps, change orders7 years
Daily ReportsField reportsProject + 6 years
PhotosProgress, issuesPermanent

Folder Structure

/[ProjectNumber]_[ProjectName]/

├── 01_Contract/
│ ├── 01_Original_Contract/
│ ├── 02_Amendments/
│ └── 03_Insurance_Bonds/

├── 02_Drawings/
│ ├── 01_Bid_Set/
│ ├── 02_Contract_Set/
│ ├── 03_ASIs/
│ ├── 04_Bulletins/
│ └── 05_As-Builts/

├── 03_Specifications/

├── 04_Submittals/
│ ├── [By_Spec_Section]/
│ └── Submittal_Log.xlsx

├── 05_RFIs/
│ └── RFI_Log.xlsx

├── 06_Change_Orders/
│ ├── PCOs/
│ └── Approved_COs/

├── 07_Meeting_Minutes/
│ ├── OAC_Meetings/
│ └── Coordination/

├── 08_Correspondence/
│ ├── Owner/
│ ├── Architect/
│ └── Subcontractors/

├── 09_Daily_Reports/

├── 10_Photos/
│ └── [By_Month]/

├── 11_Financial/
│ ├── Budget/
│ ├── Pay_Apps/
│ └── Cost_Reports/

├── 12_Safety/

└── 13_Closeout/

Drawing Management

Drawing Sets:

SetDescriptionStatus
Bid SetFor biddingSuperseded
Contract SetIssued for constructionCurrent (unless updated)
ASI DrawingsArchitect's changesAdditive
Bulletin DrawingsOwner changesAdditive
As-Built SetFinal recordFinal

Drawing Log:

Dwg #TitleRevDateIssued By
A-101Floor Plan L101/1/26ABC Arch
A-101Floor Plan L112/1/26ABC Arch

Distribution:

  • Field set (current, marked)
  • Office set (current)
  • Archive (all revisions)

Revision Control

Superseded Documents:

  • Stamp "SUPERSEDED"
  • Remove from active use
  • Archive (don't destroy)
  • Distribute current version

Revision Tracking:

  • Log all revisions
  • Date received
  • Changes noted
  • Distribution tracked

File Naming Convention

Standard Format:

[ProjectNum]_[Category]_[Description]_[Date]_[Rev]

Examples:

  • PRJ001_RFI_023_FoundationSize_20260201.pdf
  • PRJ001_SUB_09510_ACT_CeilingTiles_Rev2.pdf
  • PRJ001_MTG_OAC_20260215_Minutes.pdf

Rules:

  • No spaces (use underscores)
  • Date format: YYYYMMDD
  • Revision noted: Rev1, Rev2
  • Clear, descriptive names

Document Distribution

Transmittal Required For:

  • Drawings
  • Specifications
  • Submittals
  • Contracts
  • Major correspondence

Transmittal Log:

Trans #DateToDescription# Copies
T-0011/15ABC ElecIFC Drawings2 sets

Distribution Methods:

  • Email (most common)
  • Project management system
  • Hard copy (signed receipt)
  • FTP/cloud share

Email Management

Email Rules:

  • Use clear subject lines
  • Include project number
  • Save project-related emails
  • File in correspondence folder

Archiving:

  • Archive monthly (minimum)
  • Export important chains
  • Save with attachments

Backup Requirements

Backup Frequency:

  • Cloud sync: Continuous
  • Server backup: Daily
  • External backup: Weekly

Backup Locations:

  • Cloud storage (primary)
  • Server (secondary)
  • External drive (disaster recovery)

  • File Naming Standards
  • Email Guidelines
  • Records Retention Schedule