Site Logistics Planning
Document Type: Procedure
Version: 1.0
Last Updated: February 2026
Distribute To: Superintendents, Project Managers
Purposeโ
Establish procedures for planning and managing site logistics to support efficient construction operations.
Site Logistics Componentsโ
Key Elements:โ
- Site access and circulation
- Material staging and storage
- Equipment placement
- Temporary facilities
- Safety and security
- Utilities
- Environmental controls
Site Logistics Planโ
When to Develop:โ
- During preconstruction
- Update at major phases
- Review monthly
Plan Contents:โ
-
Site Plan Drawing
- Property boundaries
- Building footprint
- Access points
- Staging areas
- Storage locations
- Equipment positions
- Temporary facilities
- Pedestrian routes
- Vehicle routes
-
Written Procedures
- Delivery scheduling
- Material handling
- Security protocols
- Emergency access
Site Accessโ
Vehicle Access:โ
| Element | Considerations |
|---|---|
| Entry points | Location, capacity, hours |
| Traffic flow | One-way, two-way, turns |
| Road condition | Stabilized, paved, gravel |
| Weight limits | Bridge capacity, soil conditions |
| Height restrictions | Overhead lines, structures |
| Public interface | Flag persons, signage |
Pedestrian Access:โ
- Separate from vehicles when possible
- Defined walkways
- Signage
- Safety barriers
Delivery Scheduling:โ
- Schedule major deliveries
- Stagger to prevent congestion
- Coordinate with work activities
- Communicate requirements
Material Stagingโ
Staging Area Planning:โ
Considerations:
- Size needed per phase
- Proximity to installation
- Protection from weather
- Security requirements
- Ground conditions
- Access for unloading
Material Types:โ
| Material | Staging Needs |
|---|---|
| Steel/structural | Crane access, blocking |
| Mechanical equipment | Protection, rigging access |
| Finishes | Interior, climate control |
| Electrical | Secure, organized |
| Drywall | Flat, dry, close to install |
| Concrete forms | Organized, near use |
Just-In-Time Delivery:โ
- Minimize on-site storage
- Coordinate with schedule
- Reduce handling
- Protect materials
Equipment Placementโ
Planning Considerations:โ
| Equipment | Placement Factors |
|---|---|
| Tower crane | Coverage, foundations, swing |
| Mobile crane | Access, setup, ground conditions |
| Hoist | Location, capacity, timing |
| Concrete pump | Reach, access, cleanup |
| Generators | Noise, exhaust, fuel access |
Equipment Schedule:โ
- When needed
- How long on site
- Access requirements
- Removal timing
Temporary Facilitiesโ
Field Office:โ
| Requirement | Typical |
|---|---|
| Size | Based on team size |
| Location | Visible, accessible |
| Utilities | Power, data, water |
| Features | Meeting space, plan room |
Worker Facilities:โ
- Break areas
- Restrooms (OSHA requirements)
- Drinking water
- Warming/cooling areas
- First aid station
Storage:โ
- Tool storage (secure)
- Material storage
- Flammable storage
- Waste containers
Temporary Utilitiesโ
Power:โ
| Need | Solution |
|---|---|
| Construction power | Temp service, generator |
| Office power | Same or separate |
| Tool power | Distribution, GFCIs |
Water:โ
- Source (temp connection, tank)
- Distribution
- Testing/flushing needs
Sanitary:โ
- Portable toilets (1:20 workers minimum)
- Handwash stations
- ADA accessible units
Safety Considerationsโ
Site Safety:โ
- Perimeter fencing
- Controlled access
- Signage
- Emergency routes
- Fire access lanes
Traffic Safety:โ
- Speed limits
- Pedestrian separation
- Backing safety
- Spotter requirements
Securityโ
Security Measures:โ
| Measure | When |
|---|---|
| Fencing | Always (minimum) |
| Locked gates | After hours |
| Security guards | High-risk sites/phases |
| Cameras | Valuable materials, high risk |
| Lighting | Perimeter, entries |
Theft Prevention:โ
- Secure storage
- Inventory tracking
- Delivery verification
- Tool tracking
- Lighting
Environmental Controlsโ
Stormwater (SWPPP):โ
- Erosion controls
- Sediment controls
- Tracking controls
- Materials storage
Dust Control:โ
- Water trucks
- Stabilization
- Covered loads
Noise/Hours:โ
- Local restrictions
- Neighbor communication
- Schedule accordingly
Site Logistics Plan Templateโ
================================================================
SITE LOGISTICS PLAN
================================================================
Project: ___________________________________________________
Phase: ____________________________________________________
Date: _____________________________________________________
================================================================
SITE ACCESS:
Main entry: _______________________________________________
Delivery entry: ____________________________________________
Hours: ____________________________________________________
Restrictions: ______________________________________________
STAGING AREAS:
Area 1: _________________ Use: ____________________________
Area 2: _________________ Use: ____________________________
Area 3: _________________ Use: ____________________________
EQUIPMENT:
โ Tower crane Location: _______________________________
โ Mobile crane Access: ________________________________
โ Hoist Location: _______________________________
โ Other: __________________________________________________
TEMPORARY FACILITIES:
โ Field office Location: _______________________________
โ Restrooms (#__) Location: _______________________________
โ Break area Location: _______________________________
โ Storage Location: _______________________________
UTILITIES:
โ Power Source: ________________________________
โ Water Source: ________________________________
โ Data Provider: _______________________________
SECURITY:
โ Fencing Type: __________________________________
โ Lighting
โ Cameras
โ Guards Hours: _________________________________
================================================================
Plan Attached: โ Yes
Prepared By: _______________________ Date: ________________
Approved By: ______________________ Date: ________________
================================================================
Phase Transitionsโ
Update Plan When:โ
- Major phase changes
- New subcontractors mobilize
- Equipment changes
- Access changes
- Owner/tenant occupancy
Related Documentsโ
- Project Startup
- Safety Requirements
- Environmental Compliance
- Subcontractor Coordination
Template provided by support.construction. Good logistics enable efficient construction.