Material Receiving Procedure
Document Type: Procedure
Version: 1.0
Last Updated: February 2026
Distribute To: Field Staff, Superintendents, Foremen
Purposeโ
Establish a consistent process for receiving, inspecting, and documenting material deliveries to ensure correct materials in proper condition are received and tracked.
Why Proper Receiving Mattersโ
- Prevents paying for undelivered materials
- Documents damage for claims
- Ensures correct materials received
- Supports cost tracking
- Provides audit trail
- Protects against disputes
Receiving Process Overviewโ
Delivery Arrives โ Verify Order โ Inspect Materials โ
Document Receipt โ Store/Stage โ Report Issues
Step-by-Step Receiving Processโ
Step 1: Prepare for Deliveryโ
Before Delivery Arrives:
- Know what's expected (PO, submittals)
- Prepare receiving area
- Have equipment ready (forklift, crane)
- Assign receiving personnel
- Have documentation ready
Step 2: Verify the Deliveryโ
When Delivery Arrives:
-
Check Delivery Ticket:
- Correct project name/address?
- Correct supplier/vendor?
- Matches our purchase order?
- Correct materials listed?
-
Verify Against PO:
- Quantities match?
- Item descriptions match?
- Correct specifications?
Step 3: Inspect Materialsโ
Physical Inspection:
| Check | What to Look For |
|---|---|
| Quantity | Count pieces, bundles, pallets |
| Condition | Damage, rust, dents, broken |
| Specifications | Size, color, grade, type |
| Labels | Correct product, certifications |
| Packaging | Adequate protection |
Inspection by Material Type:
Concrete/Masonry:
- Check mix design/specifications
- Verify load ticket matches order
- Note time and slump (concrete)
Lumber/Wood:
- Check grade stamps
- Look for warping, splits, damage
- Verify species and dimensions
Steel:
- Check mill certifications
- Verify sizes and lengths
- Look for rust, damage
Mechanical/Electrical Equipment:
- Verify model numbers
- Check for damage
- Confirm accessories included
Finishes:
- Verify colors/patterns
- Check lot numbers (match for consistency)
- Look for damage
Step 4: Document Receiptโ
On Delivery Ticket:
โ If Complete and Acceptable:
- Sign delivery ticket
- Print name and date
- Keep your copy
โ ๏ธ If Discrepancies:
- Note exceptions on ALL copies
- "Short: 10 of 50 sheets received"
- "Damaged: 2 damaged, refused"
- Sign with exceptions noted
- Take photos
โ If Rejected:
- Write "REFUSED" on ticket
- Note reason
- Do not sign as accepted
- Notify driver and supplier immediately
- Take photos
Step 5: Process Receiving Documentationโ
Complete Receiving Report:
- Delivery date
- Supplier name
- Delivery ticket number
- PO number
- Materials received
- Condition notes
- Discrepancies
- Receiver signature
Distribute:
- Copy to project file
- Copy to AP (for invoice matching)
- Copy to PM (if discrepancies)
Step 6: Store/Stage Materialsโ
Proper Storage:
- Designated laydown areas
- Protected from weather
- Protected from theft
- Accessible for use
- Organized by trade/use
Storage Considerations:
| Material | Storage Requirements |
|---|---|
| Lumber | Elevated, covered, good ventilation |
| Steel | Elevated, rust prevention |
| Drywall | Flat, dry, interior preferred |
| Mechanical | Indoor, protected from elements |
| Finishes | Indoor, climate controlled if required |
Step 7: Report Issuesโ
Immediate Notification:
- Short shipment โ Contact supplier and PM
- Damaged materials โ Contact supplier, photos
- Wrong materials โ Do not use, contact supplier
- Quality issues โ Hold materials, notify PM
Material Receiving Checklistโ
================================================================
MATERIAL RECEIVING CHECKLIST
================================================================
DATE: ____________ PROJECT: _________________________________
SUPPLIER: ___________________ DELIVERY TICKET #: _____________
PO #: ____________________ RECEIVED BY: ____________________
================================================================
VERIFICATION:
โ Delivery ticket matches PO
โ Correct project/job address
โ Materials match order
QUANTITY CHECK:
โ Count verified
โ Quantity matches ticket
โ If short, noted on ticket
CONDITION CHECK:
โ No visible damage
โ Properly packaged
โ Labels legible
โ Certifications included (if required)
SPECIFICATION CHECK:
โ Correct size/dimensions
โ Correct type/model
โ Correct grade/specification
โ Matches submittal (if applicable)
================================================================
DISCREPANCIES:
โ None
โ Short shipped: ___________________________________________
โ Damaged: _________________________________________________
โ Wrong material: __________________________________________
โ Other: __________________________________________________
================================================================
PHOTOS TAKEN: โ Yes โ No How many: _____
DRIVER NOTIFIED OF ISSUES: โ Yes โ N/A
SUPPLIER NOTIFIED: โ Yes โ N/A
================================================================
DELIVERY ACCEPTED:
โ In full
โ With exceptions noted above
โ Rejected
RECEIVER SIGNATURE: _________________________ DATE: _________
================================================================
Handling Common Issuesโ
Short Shipmentโ
- Note on delivery ticket (all copies)
- Sign with notation "short ___ units"
- Photograph remaining load
- Notify supplier immediately
- Request make-up delivery
- Update receiving records
Damaged Materialsโ
- Note on delivery ticket (all copies)
- Photograph damage thoroughly
- Options:
- Refuse damaged items
- Accept with credit
- Accept for return
- Document decision
- Follow up with supplier
Wrong Materialsโ
- Do NOT accept if clearly wrong
- Note on ticket "refused - wrong material"
- Notify supplier immediately
- Request correct shipment
- Clarify PO if ambiguous
Concealed Damageโ
If discovered after delivery:
- Document immediately
- Photograph damage
- Notify supplier within 24-48 hours
- File freight claim if applicable
- Hold damaged materials for inspection
Stored Materials Billingโ
When Billing for Stored Materials:โ
Requirements:
- Materials on-site (or bonded warehouse)
- Properly stored and protected
- Documentation of purchase
- Photo of stored materials
- Material clearly marked for this project
Documentation:
- Vendor invoice
- Delivery receipt
- Storage photos
- Identification/tagging
Security Considerationsโ
Protecting Materials:โ
Physical Security:
- Fencing and gates
- Locked storage
- Security cameras (if available)
- Lighting
Documentation:
- Inventory lists
- Photo documentation
- Check-in/check-out logs
Theft Prevention:
- Minimal on-site storage
- JIT (just-in-time) delivery when possible
- High-value items locked
- Frequent inventory
Receiving Best Practicesโ
DO:โ
โ Inspect BEFORE signing ticket โ Note ALL discrepancies โ Take photos of issues โ Keep copies of all tickets โ Report issues immediately โ Match to PO before accepting โ Store materials properly
DON'T:โ
โ Sign without inspecting โ Accept clearly wrong materials โ Ignore minor discrepancies โ Leave materials unsecured โ Wait to report issues โ Accept without delivery ticket
Related Documentsโ
- Purchase Order Process
- Material Storage Requirements
- Inventory Management
- Damage Claim Procedure
Template provided by support.construction. Customize with your company information.