๐ค Subcontractor Management Guide
Your subs make or break your projects. Build a system to find good ones, manage them effectively, and protect yourself when things go wrong.
The cheapest sub often costs the most. Factor in risk, not just bid price.
The Subcontractor Lifecycleโ
- Prequalification โ Vet before you bid
- Bidding โ Get competitive pricing
- Award & Contract โ Lock in scope and terms
- Coordination โ Manage day-to-day
- Payment โ Pay fairly and timely
- Evaluation โ Document performance
Prequalificationโ
Do not run one process for every sub or prequalify after bids come in. Tier requirements by your exposure, set award limits, and use conditional approval when the answer is not a clean yes.
Deep dive: Subcontractor Prequalification โ the full pillar guide.
Tools:
- Prequalification Form โ full application
- Risk Scorecard โ score before you award
- Qualification Checklist โ short version for small scopes
For certificates and endorsements, see Certificates of Insurance โ limits vary by job; set them with your broker, not from a generic checklist.
Bidding & Selectionโ
Getting Competitive Bidsโ
- Invite 3-5 qualified subs per trade
- Provide complete bid packages
- Set clear scope boundaries
- Allow adequate time to bid
- Be available for questions
Bid Evaluationโ
Don't just take the low bid. Consider:
| Factor | Questions |
|---|---|
| Price | Is it realistic? Too low = problems |
| Scope | Did they include everything? |
| Exclusions | What's NOT included? |
| Schedule | Can they meet your dates? |
| Capacity | Do they have the manpower? |
| History | How did they perform before? |
Bid Levelingโ
Compare apples to apples:
- Clarify scope differences
- Add back exclusions at fair prices
- Verify unit prices are consistent
- Document assumptions
Subcontract Executionโ
Key Contract Provisionsโ
Scope of Work
- Detailed written scope
- Reference drawings and specs
- Include/exclude list
- Interface points with other trades
Schedule
- Specific milestones
- Coordination requirements
- Delay provisions
- Liquidated damages (if applicable)
Payment Terms
- Progress payment schedule
- Retention percentage
- Lien waiver requirements
- Pay-when-paid provisions
Insurance & Bonding
- Required coverage amounts
- Additional insured requirements
- Bond requirements (if any)
Change Order Procedures
- Markup percentages allowed
- Documentation requirements
- Approval process
Default & Termination
- Cure periods
- Termination for cause
- Termination for convenience
Flow-Down Provisionsโ
Ensure your subcontract includes:
- All requirements from prime contract
- Same dispute resolution process
- Matching insurance requirements
- Schedule obligations
Day-to-Day Coordinationโ
Pre-Construction Meetingโ
Before work starts:
- Review scope and schedule
- Establish communication protocols
- Identify key contacts
- Review safety requirements
- Discuss coordination points
Weekly Coordinationโ
- Schedule coordination meetings
- Review 3-week lookahead
- Identify conflicts early
- Document action items
- Follow up on commitments
Field Coordinationโ
- Daily contact with foremen
- Coordinate access and staging
- Manage shared resources
- Address issues immediately
- Document everything
Payment Managementโ
Pay Application Reviewโ
- Verify work is complete
- Check quantities
- Review stored materials
- Collect lien waivers
- Process timely
Lien Waiver Trackingโ
For each payment:
- Conditional waiver for current payment
- Unconditional waiver for previous payment
- Lower-tier waivers (if required)
Retentionโ
- Standard: 10% until 50%, then 5%
- Release at substantial completion
- Hold until punch complete
- Require final waivers
Performance Issuesโ
Early Warning Signsโ
See Warning Signs a Subcontractor Is in Trouble for the full signal list and staged response. In the field, watch for:
- Manpower below plan
- Quality issues appearing
- Missing coordination meetings
- Slow response to RFIs
- Material delivery delays
- Safety violations
Addressing Problemsโ
Step 1: Document
- Note specific issues
- Take photos
- Record dates and details
Step 2: Communicate
- Discuss with sub's PM
- Put concerns in writing
- Request corrective action plan
Step 3: Escalate
- Formal written notice
- Meet with sub's management
- Set specific deadlines
Step 4: Enforce
- Backcharges for deficient work
- Supplemental labor if needed
- Termination as last resort
Backchargesโ
When sub's work is deficient:
- Provide written notice
- Give reasonable time to correct
- If not corrected, perform or hire others
- Document all costs
- Deduct from payment or retain
Performance Evaluationโ
Track Throughout Projectโ
- Schedule compliance
- Quality of work
- Safety record
- Responsiveness
- Punch list performance
- Documentation quality
Post-Project Ratingโ
After each project, rate the sub:
- Would you use them again?
- For what project types?
- Any concerns for future?
- Update prequalified list
Related Resourcesโ
- Subcontractors Hub โ every guide, workflow, and template in this section
- Subcontractor Onboarding โ after award
- Subcontractor Agreement Generator โ the subcontract itself
- Backcharges โ when deficient work costs you money