CONCRETE POUR CHECKLIST TEMPLATE Last Updated: February 2026 ═══════════════════════════════════════════════════════════════ POUR INFORMATION ═══════════════════════════════════════════════════════════════ Project Name: _________________________ Project Number: _________________________ Pour Date: _________________________ Pour Location/Area: _________________________ Concrete Mix Design: _________________________ PSI Strength Required: _________________________ psi Weather Conditions: _________________________ Temperature: _________________________°F ═══════════════════════════════════════════════════════════════ PRE-POUR INSPECTION ═══════════════════════════════════════════════════════════════ Formwork: ☐ Formwork Complete ☐ Formwork Level/Plumb ☐ Formwork Clean ☐ Formwork Properly Braced Reinforcement: ☐ Reinforcement in Place ☐ Reinforcement Clean (no rust, oil, dirt) ☐ Reinforcement Properly Spaced ☐ Reinforcement Properly Tied ☐ Cover Requirements Met Embedments & Joints: ☐ Embedments Installed (conduit, anchors, etc.) ☐ Expansion Joints Installed ☐ Control Joints Marked ☐ Vapor Barrier Installed (if required) Subgrade & Access: ☐ Subgrade Prepared and Compacted ☐ Drainage Verified ☐ Access Routes Clear ☐ Equipment Ready (pump, vibrators, etc.) ☐ Crew Ready ═══════════════════════════════════════════════════════════════ DURING POUR ═══════════════════════════════════════════════════════════════ Time Started: _________________________ Time Completed: _________________________ Slump Test Results: _________________________ inches Air Content Test Results: _________________________% Temperature of Concrete: _________________________°F Pour Rate: _________________________ cubic yards/hour Consolidation Method: ☐ Vibrator ☐ Rodding ☐ Other: _________ Finishing Method: ☐ Screed ☐ Float ☐ Trowel ☐ Other: _______ Any Issues/Problems: _____________________________________________________________ _____________________________________________________________ ═══════════════════════════════════════════════════════════════ POST-POUR ═══════════════════════════════════════════════════════════════ Finish Quality: ☐ Excellent ☐ Good ☐ Acceptable ☐ Needs Work Curing Method Started: ☐ Water ☐ Curing Compound ☐ Covering ☐ Other: _______ Protection Installed: ☐ Yes ☐ No Temperature Monitoring Started: ☐ Yes ☐ No Test Cylinders Made: ☐ Yes ☐ No Number of Cylinders: _________________________ Cylinder ID Numbers: _________________________ Cylinder Storage Location: _________________________ ═══════════════════════════════════════════════════════════════ SIGNATURES ═══════════════════════════════════════════════════════════════ Inspector Signature: _________________________ Date/Time: ___________ Superintendent Signature: _________________________ Date/Time: ___________ Concrete Supplier Representative: _________________________ Date/Time: ___________ ═══════════════════════════════════════════════════════════════ NOTES ═══════════════════════════════════════════════════════════════ Additional Notes: _____________________________________________________________ _____________________________________________________________